Sunday, December 15, 2013

The forms are in

Brent took a trip to the farm today. A winter storm came through with a lot less precipitation than forecast, so the foundation crew will pour tomorrow. The forms are in, though, and we wanted to make sure we had photos.

Here are just a few:
The front door (it will be in the corner)

View of the Southwest corner

View of the South side (Mass wall is in center)

View of the East side
I'm hoping next post will be the foundation without the forms. Something to note, though, is the Mass Wall. It will actually have another level that will be poured later. I'm thinking it will happen at the same time they pour the pillars under the garage slab and summer kitchen slab. Interestingly, the slabs are poured last.

I am thrilled that it is starting to look like something!




No comments:

Post a Comment